QPM 2.94% 3.3¢ queensland pacific metals limited

Ann: Noosa Mining Conference Presentation, page-37

  1. 716 Posts.
    lightbulb Created with Sketch. 1534
    Thanks @pattyr.
    Hmm, our AFS put our 1.6m wmt/yr ore supply and transport costs at AUD $176.5M, which equates to AUD $110 or USD $72 / wmt at current exchange rates.
    From the FT article, local Indo ore was at USD $5 / wmt! and now at USD $20.
    Clearly a price advantage/result of BRI/unsustainable for preserving ore reserves long term.
    Philippine ore at USD $65 / wmt is more in QPM's ball park. The shipping distance looks around the same to Morowali as from NC to Townsville.

    Here's a similarly interesting read on the Philippines nickel industry and it's efforts to move up the value chain:
    https://issuu.com/brimblepublishing/docs/prj_issue_1_2023/s/20689476#:~:text=Of%20the%20nickel%20mines%20operating,Acid%20Leach%20(HPAL)%20process.

    It contains these two graphics which shows the ingenuity of QPM's Direct Nickel process (and subsequent hydrometallurgy) for it's ability to process limonite & saprolite, also avoiding multiple processing steps (often involving significant transport between each):

    https://hotcopper.com.au/data/attachments/5761/5761119-eefe440aac205d6caae2c5e54f600a50.jpg

    https://hotcopper.com.au/data/attachments/5761/5761121-cf5c1d3d1b8d043d46b31eb245cf7c28.jpg

    Early QPM presentations had a variation of this (March 2021 below):
    https://hotcopper.com.au/data/attachments/5761/5761127-8c4d13efe2a6256dc25f8b73a1d42f56.jpg

    Maybe a re-tweak of the message is needed in line with a back to basics or 'more macro' call of late.
    Add typical locations to the traditional steps, to highlight the lower transport/carbon footprint of the TECH's one stop shop solution?

    Those who watched the conference livestream may recall WA1 Resources who preceded QPM had their MD spend a good deal of time detailing the industry context for their niobium project, which sets the scene up nicely for the sciency micro stuff.
    Take a look at BHP's home page to see saturation ESG messaging done pretty well also.

    PS. my Post #: 70969642 was incorrect - the TECH project has 10 sellable products, not eight, as per AFS p14.


 
watchlist Created with Sketch. Add QPM (ASX) to my watchlist
(20min delay)
Last
3.3¢
Change
-0.001(2.94%)
Mkt cap ! $83.18M
Open High Low Value Volume
3.3¢ 3.5¢ 3.3¢ $25.95K 768.2K

Buyers (Bids)

No. Vol. Price($)
10 901738 3.3¢
 

Sellers (Offers)

Price($) Vol. No.
3.4¢ 149247 2
View Market Depth
Last trade - 16.10pm 19/07/2024 (20 minute delay) ?
QPM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.