AZL 4.76% 2.0¢ arizona lithium limited

Ann: Letter to Shareholders, page-6

  1. 115 Posts.
    lightbulb Created with Sketch. 22
    Just for clarity in my own mind (and others watching), as to the timeline (others chip in if I've got it wrong):

    1. AZL is drilling wells at the Prairie project and forging ahead with third party DLE technology, at a pilot plant.

    2. The company is due to issue a pre-feasibility study on costs and profits derived from the Prairie project, using the third party DLE technology. Hopefully before Christmas this year.

    3. DLE technology already exists and is used (South America) to extract lithium from brine. It may be necessary to use different technologies for the different wells drilled, as the chemical composition derived from the brine may change from well to well.

    4. Before starting production in 2025, AZL will issue a definitive feasibility study. But will operate 'pilot' plant/s to gain revenue in the interim.

    5. Before production starts (is this excepting the pilot plant?) AZL needs bureau of land management approval - this is still in the works. There is no expected date for approval to be granted. This has been due before, but has been delayed.

    6. While profiting from the lithium extracted from Prairie using the third party DLE technology, AZL is developing its own patented DLE technology to extract lithium from brine sans acid/s.

    ?

 
watchlist Created with Sketch. Add AZL (ASX) to my watchlist
(20min delay)
Last
2.0¢
Change
-0.001(4.76%)
Mkt cap ! $89.47M
Open High Low Value Volume
2.2¢ 2.2¢ 2.0¢ $147K 6.941M

Buyers (Bids)

No. Vol. Price($)
25 3027924 2.0¢
 

Sellers (Offers)

Price($) Vol. No.
2.1¢ 1399997 3
View Market Depth
Last trade - 16.10pm 19/06/2024 (20 minute delay) ?
AZL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.