SYA 6.90% 3.1¢ sayona mining limited

General Discussion Topics, page-125416

  1. 1,297 Posts.
    lightbulb Created with Sketch. 1362
    No, your calculation is not correct. Based on our last quarterly report the Operating cost is A$1231 (FOB), which are based on an average of 9229 dmt per month since restarting in March this year.
    This represent a 50% ramp up capacity of 18,833 per month. Once we ramp up, the cost will go definitely lower or at least below the A$1000 operating cost
    https://hotcopper.com.au/data/attachments/5783/5783944-6180b3cfb15cd301449f08a82e100e0e.jpg

    According to PLL Quarterly below, they sold 29,011 dmt at a total revenue of $47m and a costs of sales @$23.363m, which equates to U$805 (A$1219)

    https://hotcopper.com.au/data/attachments/5783/5783951-be5b37fd7220748f2a1220d6dfc36412.jpg
    https://hotcopper.com.au/data/attachments/5783/5783952-dbfeabd0427d7df752c11f3e532ba201.jpg

    https://hotcopper.com.au/data/attachments/5783/5783957-3063c84fcbd0223b053d95ab46ee346a.jpg
    So as you can see, we are definitely not making a lost as some have suggested, considering once you average out our realized selling price on A$1,985 dmt, we are making money. (BTW our current COH is $233m)






 
watchlist Created with Sketch. Add SYA (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.