IVZ 10.7% 6.2¢ invictus energy ltd

Ann: Trading Halt, page-74

  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    Logging jobs can sometimes get pulled early if a well is close to planned TD and a downhole tool failure has triggered the need for a trip. If enough of the reservoir is opened up and priority is getting a sample from same that would provide an extra reason for an early logging job.

    The use of the term "intermediate logging" suggests they plan to drill on after the logging job and conduct another logging job at 3400m.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
6.2¢
Change
0.006(10.7%)
Mkt cap ! $87.91M
Open High Low Value Volume
5.9¢ 6.2¢ 5.7¢ $151.3K 2.566M

Buyers (Bids)

No. Vol. Price($)
2 2607434 6.0¢
 

Sellers (Offers)

Price($) Vol. No.
6.2¢ 255706 8
View Market Depth
Last trade - 16.10pm 17/06/2024 (20 minute delay) ?
Last
6.1¢
  Change
0.006 ( 7.02 %)
Open High Low Volume
5.8¢ 6.2¢ 5.6¢ 1461396
Last updated 15.50pm 17/06/2024 ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.