Well they should can this hole cause to drill 400 meters for a small intersection of mineralisation isnt defining an iocg where you would need 100’s of meters of mineralisation.
no more iocg drilling until they can farm it out (if ever, look where bhp are drilling the NT for IOCG and it ain’t close to Inca) and onto lithium and doing something with the phosphate
Ann: Alpaca Hill Drilling Update and Frontier Reconnaissance, page-96
Add to My Watchlist
What is My Watchlist?