Pond 1 being filled to take advantage of the summer evaporation will be a huge milestone. That starts the countdown to production.
- Forums
- ASX - By Stock
- GLN
- Ann: HMW Phase 1 Construction on Schedule for Production H1 2025
Ann: HMW Phase 1 Construction on Schedule for Production H1 2025, page-4
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GLN (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.3¢ |
Change
-0.013(10.0%) |
Mkt cap ! $67.05M |
Open | High | Low | Value | Volume |
12.0¢ | 12.0¢ | 11.0¢ | $168.7K | 1.451M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
28 | 1537876 | 11.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 151421 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
28 | 1537876 | 0.110 |
30 | 2296956 | 0.105 |
63 | 3865811 | 0.100 |
6 | 188941 | 0.099 |
2 | 350000 | 0.098 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 151421 | 8 |
0.120 | 142590 | 8 |
0.125 | 499453 | 12 |
0.130 | 500900 | 13 |
0.135 | 1108914 | 5 |
Last trade - 14.00pm 04/10/2024 (20 minute delay) ? |
Featured News
GLN (ASX) Chart |