WR1 6.14% 53.5¢ winsome resources limited

WR1 General Discussion, page-23618

  1. 2,998 Posts.
    lightbulb Created with Sketch. 3992
    Some simple math and comparison.

    If we drop a MRE this week @55mt, for 30k of drilling, for next upgrade we will have a minimum of 30k of assays to add.

    - Using LRS upgrade as a metric, cause its a pretty poor rate of return imo on drilling, we can use .4 as the numerical for every 1000m of drilling.

    Worst case, come upgrade next year we have 67mt for 60k of drilling...

    I really doubt though that we go from 1.9mt per 1000, suddenly to 04 per 1000

    also, thats if we have 55mt...............
 
watchlist Created with Sketch. Add WR1 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.