I'd still like to know what changed TG6's mind from their original drill plan to what they presented on the 17th where two of the 6 RC holes noted were at almost the same location. What I'm talking about is the 2nd drill hole (assuming its not a map presentation error) that was also drilled down-dip of RC06.
What could have been sufficiently important that on the limited budget TG6 had at the time, they decided to put a 2nd drill hole down in almost the same location? (slightly down-dip from RC06)
- Forums
- ASX - By Stock
- TG6
- Ann: TG Metals Raises $10 Million in Placement
Ann: TG Metals Raises $10 Million in Placement, page-291
-
-
- There are more pages in this discussion • 69 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TG6 (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.5¢ |
Change
0.005(3.33%) |
Mkt cap ! $11.02M |
Open | High | Low | Value | Volume |
15.5¢ | 15.5¢ | 15.5¢ | $1.678K | 10.82K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 3086 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.5¢ | 44226 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 3086 | 0.155 |
1 | 1880 | 0.150 |
3 | 14023 | 0.145 |
2 | 17809 | 0.140 |
3 | 42833 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.175 | 44226 | 3 |
0.180 | 115766 | 3 |
0.185 | 25000 | 1 |
0.190 | 1962 | 1 |
0.200 | 1000 | 1 |
Last trade - 15.07pm 26/08/2024 (20 minute delay) ? |
Featured News
TG6 (ASX) Chart |