RMI 0.00% 2.1¢ resource mining corporation limited

whats the delay with blackstone results ??, page-5

  1. 18,150 Posts.
    lightbulb Created with Sketch. 2
    From the RDS June 30th Quarterly.

    BLACKSTONE RANGE FARMIN/JOINT VENTURE, Halleys Project (E69/2108
    and E69/2109) (Farmin with Resource Mining Corporation Ltd (ASX: RMI)
    Redstone 90%: RMC 10%)
    A Reverse Circulation (RC) drilling programme of the Halleys Cu-PGE-Ni prospect
    was completed during the quarter. The programme consisted of 3 holes to a depth of
    300m focusing on testing the thick intercepts of disseminated Cu-PGE-Ni sulphide
    mineralisation identified by the Company during two previous shallow drilling
    programmes.
    The objective of the drilling was to also test a large EM anomaly which was identified
    from a ground electromagnetic (EM) survey conducted by the Company.
    The drilling campaign was designed to assess the potential for economic
    mineralisation at depth testing the down-dip down-plunge position at the Halleys
    prospect.
    Drilling was completed in April and assaying of all the drill holes has not yet been
    completed.
    RMI has elected to retain a free carried joint venture interest of 10% until Redstone
    completes a feasibility study.

    http://hotcopper.com.au/announcementFiles/2010%5CRDS%5C2b7e6d73-07f4-46e3-948c-0968eb4d5104-RDS500185.pdf
 
watchlist Created with Sketch. Add RMI (ASX) to my watchlist
(20min delay)
Last
2.1¢
Change
0.000(0.00%)
Mkt cap ! $13.69M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
3 4035 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 19900 1
View Market Depth
Last trade - 16.12pm 12/07/2024 (20 minute delay) ?
RMI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.