STX 12.0% 28.0¢ strike energy limited

Ann: Walyering Production Update, page-95

  1. 1,829 Posts.
    lightbulb Created with Sketch. 2780


    Here the short version:

    • The current rate of 20 TJ/d is the daily minimum obligation from the initial GSA with Santos WA.
    • Walyering wells are fully brought to production and the facility can deliver at least a rate of 33 TJ/d.
    • The new GSA with Alinta Energy will increase our daily production by about 9-10 TJ/d starting from Feb.
    • Current daily production of 20 TJ is due to the optimization of the Walyering gas sales value.
    • Production capacity of the facility can be expanded above 33 TJ/d.

    ok? (love your comments )
    Last edited by gimo211: 04/01/24
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
28.0¢
Change
0.030(12.0%)
Mkt cap ! $801.0M
Open High Low Value Volume
24.5¢ 28.3¢ 24.5¢ $7.221M 26.82M

Buyers (Bids)

No. Vol. Price($)
5 293004 27.5¢
 

Sellers (Offers)

Price($) Vol. No.
28.0¢ 820079 16
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.