    I agree the experts seem to think that W7 is currently the highest priority. But, do you think that was always the case? I would have thought that if the plan all along, before FID, before production, was to have 3 production wells, it would have been done that way while Talon was picking up 45% of the cost? The drill, the testing, and the tie-in would have been more cost-effective if done simultaneously with W5 & W6. I still hope that either the SOA or probable change of domgas policy means that W7 can be deferred and that slot can be used for exploration not appraisal.
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
21.0¢
Change
0.005(2.44%)
Mkt cap ! $601.7M
Open High Low Value Volume
20.5¢ 21.3¢ 20.0¢ $1.530M 7.395M

Buyers (Bids)

No. Vol. Price($)
64 1729504 20.5¢
 

Sellers (Offers)

Price($) Vol. No.
21.0¢ 385439 63
View Market Depth
Last trade - 15.32pm 18/09/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.