Are you able to interpret any significance of this ann., or provide a SONRIS link to the abbreviations?
It sounds as though a Liner is at total depth and some cementing has taken place; but what is the function of this liner? Is this liner part of the testing procedure or does this imply production (ie same as production casing)?
anyway it does sound as though the well is well under control now; ie only small risk of a blow out.