HCH 3.23% 90.0¢ hot chili limited

$?Bill in a ? Life mine, page-25413

  1. 3,743 Posts.
    lightbulb Created with Sketch. 371
    You said: "Someone posted a desal plant within 3 years in thread over weekend. Pie in sky even if its raw water only."

    It took 3 years to build in Sydney: "Starting in 2007, construction of the Sydney Desalination Plant took three years to complete and was built in response to the worst drought in a century." (https://www.sydneywater.com.au/content/dam/sydneywater/documents/desalination-for-greater-sydney-detailed.pdf).


 
watchlist Created with Sketch. Add HCH (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.