BNL 12.5% 0.4¢ blue star helium limited

Ann: Bolling 4 SESW Drilling Update, page-9

  1. 671 Posts.
    lightbulb Created with Sketch. 321

    Wake up to yourselves...pull your heads in and STOP putting the very experienced BNL team members down.....

    We have a very valuable + $Billion resources it's called...........Helium .......lol

    The Voyager field contains 8.8% Helium Resource the evidence is building up with every well drilled.....open your eyes..lol

    ●Trent has Comfirmed we have found the 134ft 8.8% Helium gas Column within the Lyons formation Fairway Reservoir,
    ●In a COMPACTED type Sandy Soil structure (average porosity of approximately 28%)
    ● which means the tightly sandy soil structure of the 28% porosity sand in the Lyons Reservoir needs to be help Manually to loosened up and some of it removed to prevent borehole cave-in's by the sandy soil structure, by Vacuuming with a high pressure Suction Vacuum truck , too help manually to allow the HEAVILY SATURATED GAS FILLED RESERVOIR room to move to build up momentum / gas pressure up wards to our vertical well bore.

    ● it is obvious to me we have a damaged or Partialy Collapsed/ cave- in of our vertical bore hole as it entered the SANDY SOIL GAS FILLED RESERVOIR STRUCTURE at the top of the first 51ft entry of the Lyons Helium Reservoir , as the drill retracted out of the vertical well.....
    ● IMO this situation can be easily resolved over the next week or so by high pressure suction Vacuum truck Vacuuming the vertical bore hole into the 51ft borehole section of the Lyons formation Reservoir Fairway.

    ●BNL have Now Comfirmed a Massive Discovery of a Rich SATURATED GAS Filled Reservoir only 230m away from BB#1- 8.8 % Helium Reservoir 134ft gas column discovery at Our Voyager lease.

    ●It is expected that Voyager's lease will ultimately utilise a 20 well development inventory to maximise the contingent resource.
    ●which means we can extract the possibility of 8.8% Helium gas out of the ground much Quicker with a 20 wells development/ production wells.

    @doncamilo has posted a Vacuum pumping system which is a very highly effective Helium extraction system, this will help us bring the 8.8% Helium to the surface at a higher psi / kpa pressure .

    ●For BNL to achieve a 1M/ day flow rate of 8.8% Helium , BNL only needs 120psi / 850kpa down hole well pressure IMO...lol..DYOR.

    Doncamilo... thanks for sharing your post ,on Vacuum pumping the BBB#33 wells pressure.
    ●BNL have also announced using a High Pressure Suction Vacuum Truck which is very effective also , in loosening up the 28% porosity tightly packed sandy soil structure and clearing any potential cave-in/ blockage in the borehole well.

    DYOR
    GLTALSH

    256lith







 
watchlist Created with Sketch. Add BNL (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
-0.001(12.5%)
Mkt cap ! $8.508M
Open High Low Value Volume
0.4¢ 0.4¢ 0.3¢ $21.02K 5.281M

Buyers (Bids)

No. Vol. Price($)
51 64712072 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 11270360 15
View Market Depth
Last trade - 15.55pm 27/09/2024 (20 minute delay) ?
BNL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.