WR1 3.33% 69.8¢ winsome resources limited

Ann: High Grade Drilling Results at Adina Project, page-81

  1. BAU
    2,822 Posts.
    lightbulb Created with Sketch. 296
    The good news for me is that looking at the grades of the infill and the teaser WR1 provided below, it all points towards good sized coarse spod, so I think we are looking good for DMS.

    Also it is getting to the stage now that the Canadian Govt needs to get certainty around supply of SC6. The three huge battery factories being built in Quebec are expected to be in production by 2026/2027. It would be very embarrassing for the Govt if these factories had to source their supply from Africa or Brazil (China is off limits) because there was no supply currently available in Canada.

    Its becoming increasingly evident that the Canadian Govt needs to look at the mines that can be fast tracked into production to ensure supply is actually available when the battery factories come on line.

    For me the two best candidates to achieve this are James Bay and Adina.

    Just a bit of food for thought.

    https://hotcopper.com.au/data/attachments/5938/5938568-39b2ed214f810cac40db61fa25eab1be.jpg

 
watchlist Created with Sketch. Add WR1 (ASX) to my watchlist
(20min delay)
Last
69.8¢
Change
0.023(3.33%)
Mkt cap ! $146.0M
Open High Low Value Volume
67.5¢ 70.5¢ 67.5¢ $162.9K 236.0K

Buyers (Bids)

No. Vol. Price($)
2 4374 69.5¢
 

Sellers (Offers)

Price($) Vol. No.
70.0¢ 23141 4
View Market Depth
Last trade - 10.34am 12/07/2024 (20 minute delay) ?
WR1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.