I think in this context "Practical completion" means the plant is physically built but not yet calibrated. No doubt there are many settings etc and for consistency of batches will need to be tested multiple times. Much better to System Test now rather than during a client order. IMO DYOR
- Forums
- ASX - By Stock
- ADO
- 2024 - The year of ADO
2024 - The year of ADO, page-458
-
-
- There are more pages in this discussion • 270 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADO (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $54.77M |
Open | High | Low | Value | Volume |
2.2¢ | 2.3¢ | 2.2¢ | $10.34K | 465.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 337934 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.3¢ | 454657 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 337934 | 0.022 |
11 | 2009127 | 0.021 |
10 | 1055501 | 0.020 |
8 | 1099486 | 0.019 |
6 | 2172779 | 0.018 |
Price($) | Vol. | No. |
---|---|---|
0.023 | 454657 | 7 |
0.024 | 213729 | 5 |
0.025 | 1053470 | 11 |
0.026 | 291415 | 3 |
0.027 | 250000 | 1 |
Last trade - 14.06pm 18/09/2024 (20 minute delay) ? |
Featured News
ADO (ASX) Chart |