C29 1.43% 7.1¢ c29 metals limited

Ann: Significant Chalcopyrite Intervals Intersected at Mayfield, page-5

  1. 4,848 Posts.
    lightbulb Created with Sketch. 3875
    As far as I can tell hole 8 was not drilled in late 2023 because they mentioned a time consuming mobilization and separate creek crossing of Pilgrim Creek to get there, i.e. they ran out of time to drill hole 8 before demobilizing the rig. Wouldn't want to leave the rig there with the wet season coming in anyway. Might have also needed additional grader or site prep to get across Pilgrim Creek so it was postponed until 2024.

    I haven't seen any announcement of return to drilling yet (not surprising given the wet season in NW QLD). Pilgrim Creek is a big creek and there are some black soil plains and very limited existing tracks in that area that you really don't want to be in until Feb or even March.....
 
watchlist Created with Sketch. Add C29 (ASX) to my watchlist
(20min delay)
Last
7.1¢
Change
0.001(1.43%)
Mkt cap ! $9.917M
Open High Low Value Volume
7.1¢ 7.1¢ 7.1¢ $7.1K 100K

Buyers (Bids)

No. Vol. Price($)
1 311036 7.0¢
 

Sellers (Offers)

Price($) Vol. No.
7.1¢ 20041 2
View Market Depth
Last trade - 10.03am 17/06/2024 (20 minute delay) ?
C29 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.