Yes, was on Roy Hill before mine camp was constructed, 2011to 2013. Worked for a consultant (Coffey Mining) to Samsung CT and NRW.
Mainly involved with design of ROM and 356km rail mine to port.
Having been involved with many quarry/borrow pits I can tell you a drill blast operation with a couple of dumper trucks, 2/3 excavators, 2 jaw crushers and 1 or 2 Ote sorters we could easily produce 2000+t per day of raw material. What I am not familiar with is the thru put of the Steinhert sorters. Size matters, larger size is more cost etc but 3000t per week of 25% DSO is very good coin for a start up operation. Having said that we could operate all those machine with an 8 to 10 man crew per shift. Minimun 2 x 10 hour shift per day.
Once again, referring to old mate and his infrastructure comment, a camp for 40+ staff could get us producing 20 to 30,000t of raw DSO in a 4 to 5 month season. Daylight 24/7 Canadian summer
- Forums
- ASX - By Stock
- AW1
- Ann: Prospectus
Ann: Prospectus, page-26
-
- There are more pages in this discussion • 60 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AW1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.0¢ |
Change
0.005(4.76%) |
Mkt cap ! $54.35M |
Open | High | Low | Value | Volume |
10.5¢ | 11.0¢ | 10.0¢ | $114.8K | 1.090M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 11.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 113439 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 600000 | 0.105 |
12 | 784641 | 0.100 |
1 | 10000 | 0.099 |
2 | 205000 | 0.095 |
1 | 5445 | 0.092 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 117821 | 5 |
0.120 | 426738 | 7 |
0.125 | 693017 | 5 |
0.130 | 214103 | 6 |
0.135 | 549610 | 5 |
Last trade - 14.56pm 07/08/2024 (20 minute delay) ? |
Featured News
AW1 (ASX) Chart |