22 February 2024 - Agenda - No 135 - Shire of Three Springs (dplh.wa.gov.au)
Conditions
1. This decision constitutes planning approval only and is valid for a period of 5
years from the date of approval. If the subject development is not substantially
commenced within the 5 year period, the approval shall lapse and be of no further
effect.
2. The development shall be undertaken in accordance with the stamped approved
plans and supporting documents (Environmental Survey Assessment prepared
by PGV Environmental dated 22 July 2022, Geotechnical Investigation Report
Page | 1
OFFICIAL
prepared by GGC dated 17 March 2022, Bushfire Management Plan prepared
by Bushfire Prone Planning dated 10 November 2021, Aboriginal Heritage
Assessment Report prepared by Terra Rosa Consulting dated December 2021)
including any amendments and additional plans and information arising from the
approval conditions.
3. Prior to the commencement of the development a Landscape Plan shall be
submitted to the local government for approval.
4. Prior to the commencement of the use the landowner shall implement and
thereafter maintain for the lifetime of the development the landscaping shown on
the approved Landscape Plan to the satisfaction of the local government.
5. Prior to the commencement of the development a Construction Management
Plan shall be submitted to the local government for approval and approved prior
to commencement of works.
6. The development shall be completed in accordance with the approved
Construction Management Plan to the satisfaction of the local government.
7. Prior to commencement of the development a Stormwater Management Plan
shall be submitted to the local government for approval.
8. Prior to the commencement of the use the landowner shall implement and
thereafter maintain for the lifetime of the development the recommendations of
the approved Stormwater Management Plan to the satisfaction of the local
government.
9. Prior to commencement of the development a Bushfire Management Plan shall
be submitted to the local government for approval.
10. Prior to the commencement of the use the landowner shall implement and
thereafter maintain for the lifetime of the development the recommendations of
the approved Bushfire Management Plan to the satisfaction of the local
government.
11. The design and location of on-site wastewater/effluent systems shall be in
accordance with local government requirements and any requirements of the
Local Planning Scheme.
12. Prior to the commencement of the use all vehicle access point(s) onto the local
road network, car parking areas and internal vehicle accessways shall be
constructed to the satisfaction of the local government.
13. The installation of any directional/traffic/warning/safety signage in the vicinity of
the development’s access point onto the road network, and relating to the
development, shall be to the satisfaction of the local government.
14. All parking of vehicles associated with the development shall be provided for
within the property boundary and not the road reserve.
15. The applicant shall be responsible for the repair, reinstatement or replacement
of any road infrastructure that is damaged, becomes unsafe or fails to meet
appropriate engineering standards where the damage to the road network is
Page | 2
OFFICIAL
caused by reason of use of the road in connection with the approved
development, to the satisfaction of the local government (or where agreed to by
the local government the applicant may instead arrange payment to the local
government for such repair, reinstatement or replacement works to be
undertaken).
16. Prior to the commencement of the development a Light Reflection and Emissions
Management Plan and a Visual Impact Assessment as per the Western
Australian Planning Commission guidelines shall be submitted to the local
government for approval.
17. Prior to the commencement of the use the landowner shall implement and
thereafter maintain for the lifetime of the development the recommendations of
the approved Light Reflection and Emissions Management Plan to the
satisfaction of the local government.
18. The applicant is responsible to ensure that biosecurity protocols are maintained
for the site.
19. The applicant is to implement and maintain reporting mechanisms for complaints
concerning the operation of the development. In the event of a substantiated
complaint being received the applicant is required to demonstrate mitigation
response(s) to the satisfaction of the local government.
20. The applicant is required to give at least 3 months notice to the local government
if the proposed development is to cease operations and all solar panels and
ancillary structures and infrastructure must be decommissioned and removed
from the site, and the site rehabilitated through deep ripping/earthworks, to the
satisfaction of the local government, within 2 years of giving this notice, unless
the local government agrees otherwise
- Forums
- ASX - By Stock
- PGY
- PGY General Discussion
PGY General Discussion, page-101
-
- There are more pages in this discussion • 162 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PGY (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
0.002(10.0%) |
Mkt cap ! $31.41M |
Open | High | Low | Value | Volume |
1.9¢ | 2.2¢ | 1.9¢ | $172.3K | 8.430M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 2040000 | 2.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.2¢ | 164790 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 2040000 | 0.021 |
4 | 2450000 | 0.020 |
6 | 4100000 | 0.019 |
10 | 3271817 | 0.018 |
7 | 1750000 | 0.017 |
Price($) | Vol. | No. |
---|---|---|
0.022 | 164790 | 4 |
0.023 | 935476 | 1 |
0.024 | 237389 | 1 |
0.025 | 1357333 | 2 |
0.026 | 200040 | 1 |
Last trade - 16.10pm 02/10/2024 (20 minute delay) ? |
Featured News
PGY (ASX) Chart |