There you go lying again .
Why do geriatric RWNJs lie so much ?
SA coal power was shut down because the operator wanted to shut it down. Too old. Too expensive to run.
Now SA has the opportunity to benefit from the new connection because it will be able to be a proper exporter for the first time.
All that lovely green electricity being sold into the east coast . They will probably be able to sell as much as they can produce for years and years .
Only a dead set idiot would think that's a bad thing .
- Forums
- Political Debate
- South Australia fast-tracks 100 pct renewables target to 2027
South Australia fast-tracks 100 pct renewables target to 2027, page-52
-
- There are more pages in this discussion • 58 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity