Yet Spid they still managed to produce a 19000 tonne stockpile of ore with 5 random samples taken and testing over 40% TGC. All this without your drill results. It’s a miracle or maybe being onsite and viewing what’s actually going on it’s easy to see the veined ore is highly visible and the on site lab will now be responding for grade control. Drill may be required to maximise Lindi’s potential but not for the sake of delivering high grade ore upon startup. The proof is in the 19000 tonne stockpile. But keep running with your new crap angle. It may deliverer you some traction from the naive.
- Forums
- ASX - By Stock
- WKT
- Ann: Commissioning on track at the Lindi Jumbo Graphite Mine
Ann: Commissioning on track at the Lindi Jumbo Graphite Mine, page-45
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.2¢ |
Change
-0.004(4.17%) |
Mkt cap ! $61.75M |
Open | High | Low | Value | Volume |
9.7¢ | 9.7¢ | 8.9¢ | $45.75K | 501.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 200000 | 9.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.5¢ | 5315 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 200000 | 0.093 |
1 | 5500 | 0.092 |
1 | 10000 | 0.090 |
2 | 81246 | 0.089 |
2 | 58000 | 0.088 |
Price($) | Vol. | No. |
---|---|---|
0.095 | 5315 | 1 |
0.096 | 59293 | 2 |
0.098 | 61183 | 1 |
0.105 | 343296 | 3 |
0.110 | 169999 | 3 |
Last trade - 12.53pm 01/11/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |