The upgrade of the 66KV line could make LC a viable site for a Solar Electricity Farm as it does not have a real NIMBY problem. The 66KV goes to the old Mine Site and 11KV goes to Copley - LCS, Mine SS is south of the Mine Site Entrance. Is the issue insulators of the size of the conductors? Had a look on google but could not find those details.
- Forums
- ASX - By Stock
- NRZ
- Ann: Update on status of Final Feasibility Study
Ann: Update on status of Final Feasibility Study, page-46
-
- There are more pages in this discussion • 50 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NRZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.724M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
NRZ (ASX) Chart |
Day chart unavailable