RLT 1.34% 73.5¢ renergen limited

Renergen General Discussion, page-2614

  1. 3,953 Posts.
    lightbulb Created with Sketch. 927
    The DFC loan to build Phase One was US40m over 12 years with a 3 year grace period. So let's say US4.44m per year loan repayments plus interest. Then add operating costs of staff and power until they get gas to power from Phase 2 and other miscellaneous costs etc..

    Revenues if calculated correctly show US18m (AUD28m) per year from LNG only at full capacity this assumes US20/mmbtu which I think Stef mentioned in a recent video..

    If the above is accurate and US20/mmbtu for LNG can be achieved then the Phase One plant is potentially profitable once ramped up to full capacity (been running under 50% I think last year) from LNG only before adding on the helium revenues..


    https://hotcopper.com.au/data/attachments/6007/6007292-f0b264480c8e0b4cccc2453966aa478b.jpghttps://hotcopper.com.au/data/attachments/6007/6007286-528a174c5222c910cc2cf1bdf6e08d81.jpghttps://hotcopper.com.au/data/attachments/6007/6007289-f45a0d9d7e3953b58109a6187a6ee61b.jpg
 
watchlist Created with Sketch. Add RLT (ASX) to my watchlist
(20min delay)
Last
73.5¢
Change
-0.010(1.34%)
Mkt cap ! $22.28M
Open High Low Value Volume
75.0¢ 75.0¢ 73.5¢ $23.28K 31.04K

Buyers (Bids)

No. Vol. Price($)
3 41055 72.5¢
 

Sellers (Offers)

Price($) Vol. No.
74.5¢ 5000 2
View Market Depth
Last trade - 15.47pm 10/07/2024 (20 minute delay) ?
RLT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.