Riddle me this please
Walyering has 1P reserves certified by RISC of 32.4 PJ. (call that R1p)
Nameplate processing capacity now reached is 33tj/d
Annually at 100% capacity that is 12.045 pj (call that AP)
AP/R1p gives the number of years of expected production
It does not need much of a calculator or very much time to get to 2.69. - Years that is.
Less than three years
The same sum can be done for 2P assuming it can be fully produced is 4.48 years.
Grand total max life of 7.17 years as things stand.
So, you can do your 1P IRR over 2.69 years and the 1P+2P over 7.17 years. First though, answer this - Does one include the acquisition costs to STX of Talon in a Walyering IRR along with all the other CAPEX? It makes quite a difference to the rate of return and NPVs even at today's STX price.....Second, chew on why one would do this in the first place.
Anyone care to comment - constructively please, I don't appreciate insults and abuse - those are the last resort of intellectual pygmies.
- Forums
- ASX - By Stock
- STX
- Analyst Notes and Price Targets
Analyst Notes and Price Targets, page-190
-
-
- There are more pages in this discussion • 298 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
21.5¢ |
Change
-0.005(2.27%) |
Mkt cap ! $616.0M |
Open | High | Low | Value | Volume |
22.0¢ | 22.5¢ | 21.0¢ | $4.542M | 20.80M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 343465 | 21.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.0¢ | 563407 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 680227 | 0.210 |
14 | 878187 | 0.205 |
16 | 1600122 | 0.200 |
20 | 1202513 | 0.195 |
29 | 1334836 | 0.190 |
Price($) | Vol. | No. |
---|---|---|
0.220 | 517953 | 8 |
0.225 | 1943976 | 12 |
0.230 | 1974439 | 22 |
0.235 | 670357 | 14 |
0.240 | 2349819 | 19 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |