MAY 3.03% 3.2¢ melbana energy limited

Cuba Block 9: Alameda-3 Drilling Update 22 February 202, page-125

  1. 7,897 Posts.
    lightbulb Created with Sketch. 1031
    Someone please correct me if I am wrong: but from memory, about a week (give or take 7 days!). On 29th February they said they were "Currently preparing to undertake wireline logging in open hole", before drilling on. Based on what someone reported here earlier today, casing is now complete - which means that drilling has recommenced. It should be about 7 days until they stop and core mid way through the next section. I think that is when the real fun will start.

    Still expecting a Drilling Update today (most likely released on Melbana's site, not on ASX - https://www.melbana.com/site/news-events/block-9-cuba-operations-updates)

    Kit.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.