CPM 0.00% 5.4¢ cooper metals limited

Ann: IP Survey confirms 300m long chargeability at Brumby Ridge, page-15

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 5,229 Posts.
    lightbulb Created with Sketch. 3176
    This is an amazing buying opportunity.

    Did an insto dump? New entrants perhaps from the CR.
    Then a cascade of selling, recent buyers fueled ?

    Our CPM Ceo is simply honest and trustworthy.
    He is heavily personally invested also- and at way above this shareprice.
    In any case Ian is a solid Geo and has reported on this at once —instead of holding it until the drill campaign completion, as maybe not the anticipated drill results, for this hole especially.

    The Brumby Ridge drilling is actually ongoing still right now, for additional perspective.
    He will organise new drill holes at pivoted (angled) orientation to determine why the aberrance to the fantastic drill results from end of 2023 for this location Brumby Ridge.

    Cooper is well- funded for this year with over $5 million in the bank.

    Brumby Ridge alone is an extensive area, with ongoing drilling to occur.
    The company holds though considerable highly prospective territory at Cloncurry-Isa, with other tenements with previous resource discovery success, & great overall area held.

    Drilling is actually to be ongoing and through this year, and onwards.

    So this is crazy - an EV of $5 million only?
    Last edited by Aqua65: 13/03/24
 
watchlist Created with Sketch. Add CPM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.