NDO 0.00% 86.0¢ nido education limited

the way forward, page-19

  1. 85 Posts.
    lightbulb Created with Sketch. 2
    The only issue with Swell packers is they need hydrocarbons to swell properly. At such a high water cut I wonder if they would work properly?

    I would favour either a sidetrack out of the cemented 9 5/8" casing (lets run a CBL log before hand to check it is OK 1st) or a new well entirely, if a well could be drilled concurrently with producing this one. Given NDO's track record as an operator this would be a big ask.

    The major issue is getting funding from the JVP's and if that falls over then can NDO finance it alone?

    cheers,

    OM.
 
watchlist Created with Sketch. Add NDO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.