VMM 4.00% 91.0¢ viridis mining and minerals limited

Ann: Step-Out Drilling Intercepts up to 24,894ppm TREO, page-105

  1. 4,515 Posts.
    lightbulb Created with Sketch. 241
    Auger drilling vs diamond drilling clay vs hard rock we drill 10x as many holes into better grades at 20x less cost than there is processing hard rock.
    Crushing, grinding, separation, acids heat application to process = hard rock.
    Clay gravity separation and leaching to produce concentrate mixed REE.
    Not hard to work out why.
 
watchlist Created with Sketch. Add VMM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.