SPR 10.7% 98.5¢ spartan resources limited

Ann: More strong drill hits across key prospects, page-45

  1. 33,487 Posts.
    lightbulb Created with Sketch. 1742
    Thank you for enlightening us to the pit wall slip it does look like a major failure .
    A photo of the slip you referred to is below .
    There is ore at that North end of the pit below the current pit floor .
    "No. That ramp is the only access into the pit. To take it out means a complete cutback from the top down."
    That sounds like that would be the logical plan

    Would think they can move that tailings dam back if they decide it is necessary , however it looks to be around 100 meters from the current top of the pit edge .
    This all has to be taken into context of a potential high margin UG gold project with supplementary open cut satellite pits .T
    he North end of Dalgaranga being just one possible source of ore however a ramp will be needed to get to the base of the Dalgaranga pit for a drive into NN so a cutback of the slip area at the very least will be necessary so as to provide a foundation for a re-routed ramp .

    dal.PNG
    Last edited by plough: 21/03/24
 
watchlist Created with Sketch. Add SPR (ASX) to my watchlist
(20min delay)
Last
98.5¢
Change
0.095(10.7%)
Mkt cap ! $1.088B
Open High Low Value Volume
90.0¢ $1.00 90.0¢ $6.153M 6.372M

Buyers (Bids)

No. Vol. Price($)
1 200000 97.5¢
 

Sellers (Offers)

Price($) Vol. No.
99.0¢ 16444 2
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
SPR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.