MAY 3.13% 3.1¢ melbana energy limited

Cuba Block 9: Alameda-3 Drilling Update 29 February 2024, page-359

  1. 3,644 Posts.
    lightbulb Created with Sketch. 1972
    Kit67,

    True. Not much more can be said.

    If it were a drilling update I would be surprised as I'm assuming they would only be 1/2 way through the alameda. Drilling takes time and slow going for recovery of cores is essential as was the case in the upper sheet. I could see a big increase in net/gross due to fractures as these are pervasive in the lower sheet.

    We could be sitting on a truly massive discovery.

    best of luck holders
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.1¢
Change
-0.001(3.13%)
Mkt cap ! $104.4M
Open High Low Value Volume
3.1¢ 3.1¢ 3.0¢ $29.78K 986.3K

Buyers (Bids)

No. Vol. Price($)
13 1151258 3.0¢
 

Sellers (Offers)

Price($) Vol. No.
3.1¢ 367393 3
View Market Depth
Last trade - 16.10pm 15/11/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.