From the pictures I've seen the damage was mainly the pilons holding the vessel in place. The Pilon base would be concrete, hard to destroy, but the steel above was smashed to.pieces.
The ore convertor belt was lifted so.undamagrd.
Even though these bulk carriers are massive securing them can be done in other ways, until more permanent pilons can be replaced
You could use an anchor system for example.
S32 will be on it, so I'm not too pessimistic when thinking about how long production will be affected
- Forums
- ASX - By Stock
- S32
- Ann: Australia Manganese Update
Ann: Australia Manganese Update, page-72
-
- There are more pages in this discussion • 58 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add S32 (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.68 |
Change
-0.060(1.60%) |
Mkt cap ! $16.66B |
Open | High | Low | Value | Volume |
$3.64 | $3.70 | $3.63 | $46.35M | 12.65M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 16139 | $3.67 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.69 | 45098 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 13819 | 3.670 |
2 | 503819 | 3.660 |
2 | 13973 | 3.650 |
5 | 17719 | 3.640 |
2 | 14120 | 3.630 |
Price($) | Vol. | No. |
---|---|---|
3.690 | 41836 | 4 |
3.700 | 50458 | 9 |
3.710 | 13819 | 1 |
3.720 | 16819 | 2 |
3.730 | 38819 | 2 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
S32 (ASX) Chart |