SYA 3.23% 3.0¢ sayona mining limited

Ann: Moblan Lithium Project Definitive Feasibility Study, page-232

  1. 1,942 Posts.
    lightbulb Created with Sketch. 727
    Thats with a triple crushing configuration and mag sep on both course and fine conveyors. Also i been banging on about PLS's "primary rejects" chute and if you look at the flow chart on the Moblan dfs it looks like they have a reject chute that takes nothing over 6.5mm. With a 1.15% input grade in with a low strip (very little rubbish in the mix) thats definitely adequate enough for a 74% recovery.
    NAL is targetting 67% with a retro fit crushing circuit and re-feed chute. And may already be there. I believe NAL could get to 70% with the C150 in place early next year too.
    Dont be too concerned with the lofty target as the filtration circuits are becoming more efficient and more advanced and I would expect even a 74% recovery rate to become the lower end of the scale over the next decade.
    It needs to as well, to compete with the brine projects.

    One more thing is after the Moblan DFS is updated with the remainder of the drilling results, the input grade shoud be 1.31% to 1.35%, making it even more likely to be able to reach that target.

    Sylvain really knows his sh*t.
 
watchlist Created with Sketch. Add SYA (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.