MAY 27.1% 6.1¢ melbana energy limited

Cuba Block 9: Alameda-3 Drilling Update 29 February 2024, page-489

  1. 1,276 Posts.
    lightbulb Created with Sketch. 225

    A good reminder of what can be expected in the next few weeks, based on the 1988 marti- 5 drill. Oil and Gas influx at 3241m. Oil shows seen over 850m interval over the lower sheets (in line with Melbanas first well).

    Testing of the lower zone recovered 44 barrels of 24 API

    https://hotcopper.com.au/data/attachments/6059/6059612-c50c27224b7e6e6dd5d86e60bb40d37f.jpg
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
6.1¢
Change
0.013(27.1%)
Mkt cap ! $205.5M
Open High Low Value Volume
4.9¢ 6.1¢ 4.9¢ $769.4K 13.80M

Buyers (Bids)

No. Vol. Price($)
1 111111 6.0¢
 

Sellers (Offers)

Price($) Vol. No.
6.1¢ 246576 1
View Market Depth
Last trade - 16.10pm 26/06/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.