CBE 7.14% 7.5¢ cobre limited

Ann: Commencement of Process Design Scoping Study for Ngami, page-2

  1. 1,547 Posts.
    lightbulb Created with Sketch. 768

    "METShas a strong experience base in In-Situ leaching including work on both copper and uranium projects"

    'The copper-silver mineralisation is estimatedbetween 103 and 166Mt @ 0.38 to 0.46% Cu1
 
watchlist Created with Sketch. Add CBE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.