I suspect this relates to the "McPhillamys Gold Project -Modification 1" commenced with EPBC in October 23.
The modification was submitted to modify development consent to incorporate changes identified by the DFS process, specifically:
- additional mine development disturbance areas to allow for the optimised layout;
- the water supply pipeline (including pump stations, pressure reducing systems and control system); and
- the 132 kV ETL (including switching station).
Today the EPBC notified that an assessment approach has been determined. It usually takes around 3 days to publish that decision, not sure if Regis gets advance notice or not. The timing of publication would be consistent with the period of the TH.
If you are interested you can view all documents and follow progress here:
https://epbcpublicportal.awe.gov.au/all-referrals/project-referral-summary/project-decision/?id=d67a5750-f6d5-ee11-904d-0022489332c3
- Forums
- ASX - By Stock
- RRL
- Ann: Pause in Trading
Ann: Pause in Trading, page-34
-
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RRL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.92 |
Change
-0.035(1.79%) |
Mkt cap ! $1.450B |
Open | High | Low | Value | Volume |
$1.91 | $1.93 | $1.89 | $9.807M | 5.138M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 57721 | $1.92 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.92 | 49074 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 33147 | 1.910 |
2 | 6279 | 1.905 |
6 | 128981 | 1.900 |
3 | 26845 | 1.895 |
5 | 26592 | 1.890 |
Price($) | Vol. | No. |
---|---|---|
1.920 | 49074 | 4 |
1.925 | 60818 | 4 |
1.930 | 85595 | 4 |
1.935 | 17503 | 2 |
1.940 | 85225 | 5 |
Last trade - 16.10pm 19/07/2024 (20 minute delay) ? |
Featured News
RRL (ASX) Chart |