The uncertainty of ramp-up at Woodlawn is completely different to what G1A had, G1A constructed an entire new mill on an orebody that had never been mined before and got the geology and grade control wrong thus mining wrong.
At Woodlawn there is a long production history of over 20 years from the previous operation, albeit at an old mill that does not exist anymore, but there is a new mill of a similar type to the old Woodlawn mill, absolutely chalk and cheese when it comes to ramp-up risks between an entirely new mine and mill vs an existing mine with a new but better mill.
- Forums
- ASX - By Stock
- DVP
- Ann: Woodlawn Production Restart Study - NPV increases by 37%
Ann: Woodlawn Production Restart Study - NPV increases by 37%, page-212
-
-
- There are more pages in this discussion • 141 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DVP (ASX) to my watchlist
|
|||||
Last
$2.10 |
Change
0.060(2.94%) |
Mkt cap ! $541.9M |
Open | High | Low | Value | Volume |
$2.03 | $2.11 | $2.02 | $2.352M | 1.143M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 5892 | $2.08 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.10 | 4390 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 5892 | 2.080 |
1 | 5892 | 2.070 |
1 | 8500 | 2.030 |
4 | 5192 | 2.000 |
1 | 100 | 1.990 |
Price($) | Vol. | No. |
---|---|---|
2.100 | 4390 | 1 |
2.110 | 10892 | 4 |
2.120 | 16972 | 6 |
2.130 | 22500 | 2 |
2.140 | 9262 | 1 |
Last trade - 16.10pm 30/07/2024 (20 minute delay) ? |
Featured News
DVP (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online