DVP 2.94% $2.10 develop global limited

Ann: Woodlawn Production Restart Study - NPV increases by 37%, page-212

  1. 4,948 Posts.
    lightbulb Created with Sketch. 3945
    The uncertainty of ramp-up at Woodlawn is completely different to what G1A had, G1A constructed an entire new mill on an orebody that had never been mined before and got the geology and grade control wrong thus mining wrong.

    At Woodlawn there is a long production history of over 20 years from the previous operation, albeit at an old mill that does not exist anymore, but there is a new mill of a similar type to the old Woodlawn mill, absolutely chalk and cheese when it comes to ramp-up risks between an entirely new mine and mill vs an existing mine with a new but better mill.
 
watchlist Created with Sketch. Add DVP (ASX) to my watchlist
(20min delay)
Last
$2.10
Change
0.060(2.94%)
Mkt cap ! $541.9M
Open High Low Value Volume
$2.03 $2.11 $2.02 $2.352M 1.143M

Buyers (Bids)

No. Vol. Price($)
2 5892 $2.08
 

Sellers (Offers)

Price($) Vol. No.
$2.10 4390 1
View Market Depth
Last trade - 16.10pm 30/07/2024 (20 minute delay) ?
DVP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.