If the feed ore grades 1.5% Li20, then you need 5 tonnes ore at 80% recovery rate to produce 1 tonne 6% grade concentrate (i.e. 1.5% * 5 * 80% = 6% grade concentrate). That means 2.5mtpa orefeed results in 500,000 tonnes 6% gade spodumene concentrate.
Noting though LTR is actually building a 3mtpa facility (stage 1), with a view to expanding orefeed capacity to 4mtpa down the track.
Achieving recovery rate is the key as the recovery rate is a key to costs per tonne.
Quality is also about producing concentrate on spec, and LTR has that ability as the ore has low deleterious elements. Further info in:
https://hotcopper.com.au/posts/71113718/single
Hope that helps.
All IMO
- Forums
- ASX - By Stock
- LTR
- ASX Today
ASX Today, page-40072
Featured News
Add LTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
81.0¢ |
Change
-0.035(4.14%) |
Mkt cap ! $1.965B |
Open | High | Low | Value | Volume |
85.5¢ | 85.5¢ | 81.0¢ | $9.418M | 11.38M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 320584 | 81.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
82.5¢ | 33321 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 320584 | 0.810 |
9 | 202081 | 0.805 |
25 | 357474 | 0.800 |
7 | 161014 | 0.795 |
12 | 184149 | 0.790 |
Price($) | Vol. | No. |
---|---|---|
0.825 | 32636 | 5 |
0.830 | 271352 | 9 |
0.835 | 30000 | 1 |
0.840 | 174349 | 5 |
0.845 | 88499 | 6 |
Last trade - 16.10pm 19/11/2024 (20 minute delay) ? |
Featured News
LTR (ASX) Chart |