My calculation is
150ppm means 150mg/L lithium.
0.54 cubic meter/sec x 1000L/cubic meter x 150mg/L = 81000mg/sec = 81g/sec lithium
based on my previous post, the recovery I used is 91.5%x88.6%=81.069%. So for 1 hour, we will have
81g/sec x 81.069% x 3600 sec/h = 236,397.204g/h = 236.397kg/h lithium.
the LCE to Lithium metal ratio is 5.323. So we will get 1258.34kg LCE per hour.
If running 24/7, then we will have 30.2 tons LCE per day and 11,023 tons per annum.
with the consideration of the maintenance, the number should be less but 10,000tpa should be achievable.
- Forums
- ASX - By Stock
- ASN
- Ann: Approval from State of Utah for Brine Extraction -GreenRiver
Ann: Approval from State of Utah for Brine Extraction -GreenRiver, page-36
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $104.2M |
Open | High | Low | Value | Volume |
7.7¢ | 7.9¢ | 7.5¢ | $169.3K | 2.202M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 13157 | 7.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.7¢ | 113969 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 226223 | 0.075 |
7 | 342446 | 0.074 |
7 | 545630 | 0.073 |
9 | 824609 | 0.072 |
3 | 1172856 | 0.071 |
Price($) | Vol. | No. |
---|---|---|
0.079 | 409641 | 7 |
0.080 | 880284 | 4 |
0.081 | 1226780 | 5 |
0.082 | 351614 | 2 |
0.083 | 500000 | 3 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |