SYA 3.23% 3.0¢ sayona mining limited

General Discussion Topics, page-138563

  1. 3,493 Posts.
    lightbulb Created with Sketch. 663
    the altura project suffered because banks recalled loans at the low of the last lithium cycle , the mining side of project was going well , if the banks hadn’t recalled loans they would have been a very successful operation, plenty of people use this to blame JB but the lithium market cycle was the main reason for there collapse something which JB has so far prevented from happening with sya
 
watchlist Created with Sketch. Add SYA (ASX) to my watchlist
(20min delay)
Last
3.0¢
Change
-0.001(3.23%)
Mkt cap ! $308.7M
Open High Low Value Volume
3.1¢ 3.2¢ 3.0¢ $509.3K 16.52M

Buyers (Bids)

No. Vol. Price($)
118 27732453 3.0¢
 

Sellers (Offers)

Price($) Vol. No.
3.1¢ 3034261 11
View Market Depth
Last trade - 16.10pm 30/07/2024 (20 minute delay) ?
SYA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.