The new Phase 2 results are generally inline, or better than, the modelling work with consistent mineralisation
seen between the holes. The broad ~200m intervals, with grades of around 0.28% to 0.31% Ni, were generally
defined by coincident 0.16% Ni and 0.1% S cut-offs, with only very minimal inclusion of material below mineable
widths. At higher cut-offs these results should comfortably increase to averages over 0.30% Ni, inline with the
Company’s target for the central core of several hundred million tonnes at better than 0.30% Ni grade.
- Forums
- ASX - By Stock
- WMG
- Ann: All Phase 2 RC Holes Show Broad Sulphide Mineralisation
Ann: All Phase 2 RC Holes Show Broad Sulphide Mineralisation, page-3
-
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WMG (ASX) to my watchlist
(20min delay)
|
|||||
Last
25.5¢ |
Change
0.015(6.25%) |
Mkt cap ! $21.71M |
Open | High | Low | Value | Volume |
24.0¢ | 25.5¢ | 24.0¢ | $9.744K | 39.87K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 24.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
25.5¢ | 15084 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 0.240 |
2 | 23606 | 0.235 |
1 | 4326 | 0.230 |
3 | 60077 | 0.220 |
1 | 93023 | 0.215 |
Price($) | Vol. | No. |
---|---|---|
0.255 | 15084 | 1 |
0.260 | 25000 | 1 |
0.280 | 51500 | 2 |
0.285 | 50000 | 1 |
0.300 | 10367 | 1 |
Last trade - 16.10pm 09/10/2024 (20 minute delay) ? |
Featured News
WMG (ASX) Chart |
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
SPONSORED BY The Market Online