When you turned on the light, page-110

  1. 4,872 Posts.
    lightbulb Created with Sketch. 373
    That means that coal is gone.

    I didn't realize you had a sense of humour.

    Coal is there to stay Jose'

    After the permitting spree of the past year, China now has 243 GW of coal-fired capacity currently permitted and under construction.

    If the permitting rush is not stopped until projects that are currently announced or in pre-permit stages have gained permits as well, there will be a total of 392 GW of new coal-fired power capacity in the pipeline.

    Unless permitting is stopped immediately, China won’t be able to reduce coal-fired power capacity during the 15th five-year plan without subsequent cancellations of already permitted projects or massive early retirement of existing plants.https://energyandcleanair.org/publication/chinas-new-coal-power-spree-continues-as-more-provinces-jump-on-the-bandwagon/#:~:text=The%20permitting%20dates%20and%20related,6%3A%202023%2D02%2D23

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.