MAY 5.26% 3.6¢ melbana energy limited

Ann: Melbana Energy in Cuba, page-80

  1. 19,072 Posts.
    lightbulb Created with Sketch. 2666
    This structure is certainly a good starting point. But will need something more

    • Cased hole test of Unit-1B limestones.
    • Perforated casing over multiple intervals @ 6spf.
    • Total shot length of ~76m over a gross interval of 443m (17%).
    • Upper section dominated by porosity/matrix while lower portion dominated by fractures.
    • Multi flow test conducted on a variety of chokes over 24 hours with a 48 hour shut in. Additional flow for further sampling conducted
    after shut in.
    • Average stabilised flow rate of 1235bopd achieved through a 36/64” choke over 12 hrs.
    • Lab analysis of samples indicate a lighter, higher mobility oil of ~19°API.
    • Reservoir pressure built up quickly indicating good permeability with no depletion observed.
    • Interpretation indicates a minimum 16 mmbbls STOIIP observed during the DST.
    • Established column of 344mTVD tested in the well
    • Cement indicated over basal perforation zone. Hence some uncertainty of how uniform was the contribution to flow.

    Add a bit of stimulants, who knows what could be achieved.


    Last edited by Cosmoterios: 16/05/24
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.