A case study of the risk -
UAMPS (Utah Associated Municipal Power Systems) is a US regional coalition that develops local government owned electricity generation projects. Up until the project’s cancellation in November 2023, UAMPS was the developer of a nuclear SMR project called the Carbon Free Power Project (CFPP) with a gross capacity of 462MW. It was planned to be fully operational by 2030. After conversion to 2023 Australian dollars, project costs were estimated in 2020 to be $18,200/kW which is only slightly below the level that GenCost had been applying ($19,000kW).
In late 2022 UAMPS updated their capital cost to $28,580/kW citing the global inflationary pressures that have increased the cost of all electricity generation technologies. The UAMPS estimate implies nuclear SMR has been hit by a 57% cost increase which is much larger than the average 20% observed in other technologies.
- Forums
- ASX - By Stock
- PDN
- Australia going nuclear?
Australia going nuclear?, page-62
-
- There are more pages in this discussion • 147 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PDN (ASX) to my watchlist
(20min delay)
|
|||||
Last
$11.73 |
Change
-0.100(0.85%) |
Mkt cap ! $3.589B |
Open | High | Low | Value | Volume |
$11.92 | $12.07 | $11.64 | $14.00M | 1.182M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 1223 | $11.72 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$11.73 | 650 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 608 | 11.730 |
17 | 4642 | 11.720 |
12 | 4970 | 11.710 |
12 | 9539 | 11.700 |
6 | 11875 | 11.690 |
Price($) | Vol. | No. |
---|---|---|
11.740 | 3213 | 15 |
11.750 | 3528 | 14 |
11.760 | 12816 | 10 |
11.770 | 5749 | 10 |
11.780 | 3453 | 6 |
Last trade - 13.46pm 03/10/2024 (20 minute delay) ? |
Featured News
PDN (ASX) Chart |