WKT 1.01% 10.0¢ walkabout resources ltd

Ann: Development Progress - Lindi Jumbo Mine, page-5241

  1. 2,317 Posts.
    lightbulb Created with Sketch. 928
    HaHa Nameslittle. The resource drops off so much to the point a new 3 year mine plan was developed completely outside the original 24yr lom dfs. Not only that drill results have confirmed to to northern and southern end of the original 24yr lom pit shell are open ended. It cost roughly US$400 and I say roughly so you know who doesn’t intervene to ‘produce’ 1 tonne of Lindi Jumbo concentrate. How much does it cost to load and dump 1 tonne of waste on the TSF dam wall where it has always been allocated. It appears the full team has come out in force now that Spid news has be shown to be telling fibs on SYR and Molo’s weathered material. Nameslittle can you tell Spid what the MPA ratings are for Lindi Jumbo’s weathered and transitional fresh material. HaHa. Yes transitioning mean from one to another. Over a greater distance it could be significant, but not over 5-7m. This is getting hilarious how desperate the negative pumpers have become.
 
watchlist Created with Sketch. Add WKT (ASX) to my watchlist
(20min delay)
Last
10.0¢
Change
0.001(1.01%)
Mkt cap ! $67.12M
Open High Low Value Volume
9.9¢ 10.0¢ 9.7¢ $33.71K 342.6K

Buyers (Bids)

No. Vol. Price($)
2 72606 9.7¢
 

Sellers (Offers)

Price($) Vol. No.
10.0¢ 271117 4
View Market Depth
Last trade - 15.13pm 14/08/2024 (20 minute delay) ?
WKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.