MAY 5.56% 3.4¢ melbana energy limited

All Aboard: May Train running express to 12.5 cents Stand Clear Stand Clear Please, page-71

  1. 7,897 Posts.
    lightbulb Created with Sketch. 1031
    What part don't people understand!

    https://hotcopper.com.au/data/attachments/6208/6208591-632d04157b61aad31d7c67d645a6333c.jpg

    End of week would be circa 24.05.2024.
    Two weeks would put you around 07.06.2024. That would be TD.
    Flow tests thereafter. Marti, then 3 in Alameda (DST 2 through 5).

    https://hotcopper.com.au/data/attachments/6208/6208598-4cfeace110db2a329dcf1c85223864f6.jpg

    Note that DST 2 is not marked as open hole, but also not marked as perforated (so I am not sure if they are casing first, which could easily add another 1-2 weeks). Marked as a slotted liner in the Marti Section: perhaps an O&G expert can provide some guidance on install time.

    Anyone expecting anything before the end of June is kidding themselves. Sure, we may get an update or two; but the actual DST results won't be here this side of 30 June.

    Patience required.

    Kit.


    Last edited by Kit67: 30/05/24
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.