MAY 4.65% 4.1¢ melbana energy limited

Ann: Block 9, Alameda-3 Appraisal Update, page-458

  1. 3,546 Posts.
    lightbulb Created with Sketch. 1837
    cosmo,

    An exact answer may be difficult to determine but I think that a side-track isn't required at this point. They will likely do an acid washout and see if that works, from my understanding they were getting influx so it's unlikely they were overbalanced unless the pressure regime is very complex with all the fractures etc.

    We will see. Hopefully the remedy works and we can get flows.

    Anyway the alameda flow tests should be commencing shortly and that will be exciting stuff. The other option is to drill the Marti section old school and see what flows can be achieved up to safety limits.

    best of luck holders
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
4.1¢
Change
-0.002(4.65%)
Mkt cap ! $138.1M
Open High Low Value Volume
4.2¢ 4.3¢ 4.1¢ $184.4K 4.395M

Buyers (Bids)

No. Vol. Price($)
11 946604 4.1¢
 

Sellers (Offers)

Price($) Vol. No.
4.2¢ 250000 1
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.