RMI 0.00% 1.6¢ resource mining corporation limited

calm, page-11

  1. 70 Posts.
    With a regular drill-sample-assay system now underway, it is anticipated that more regular
    reporting of assay results will become a feature of the exploration program during
    November/December.
    Drilling progress has necessitated the construction of a secondary camp site 6km to the
    south of the current two operating camps. Moving both crews to this southern camp will
    occur during early November and will allow the current productivity levels to be maintained.
 
watchlist Created with Sketch. Add RMI (ASX) to my watchlist
(20min delay)
Last
1.6¢
Change
0.000(0.00%)
Mkt cap ! $10.43M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
3 298234 1.5¢
 

Sellers (Offers)

Price($) Vol. No.
1.8¢ 14163 1
View Market Depth
Last trade - 16.12pm 25/07/2024 (20 minute delay) ?
RMI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.