GGE 14.3% 0.3¢ grand gulf energy limited

we have oil!!, page-31

  1. 1,831 Posts.
    lightbulb Created with Sketch. 640
    They DO NOT say they will build the production facility. They say:

    ---
    A successful testing of the Dugas & Leblanc # 2 well will require a 2,200ft gas pipeline for connection to the Gulf South gas system and the construction of permanent surface facilities.
    ---

    That's conditional.

    They have carefully avoided using language that emphasises that it is conditional but the statement clearly leaves open that production facilities will NOT be built if the testing is NOT successful.

    As sasa said, and others have repeated, this is a conditional statement, not a statement that they will go ahead and build a production facility.

    Dis was even kind enough to explain the regulatory background for this statement.


 
watchlist Created with Sketch. Add GGE (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
-0.001(14.3%)
Mkt cap ! $7.351M
Open High Low Value Volume
0.3¢ 0.3¢ 0.3¢ $27K 9M

Buyers (Bids)

No. Vol. Price($)
1 147853 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 7338450 12
View Market Depth
Last trade - 12.43pm 07/11/2024 (20 minute delay) ?
GGE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.