DUTTON ATTEMPTS BLOCKING RENEWABLES, page-44

  1. 5,009 Posts.
    lightbulb Created with Sketch. 122
    A nuke plant could be built and actually finished before White Elephant 2.0 will be finished,

    2.0 plugged-in will cost $35 billion and maybe, MAYBE, finished by 2035, if you're lucky, but probably never.

    Difference is we are building a heap of part-time energy sources, and constructing duplicate and triplicate transmission infrastructure.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.