It will be a critical Quarterly Report released next month. The raw numbers don't lie. Essentially a full reconciliation is required:
1) The mining grade control model must be reconciled against the weighted average belt samples in the crushing and grinding circuits of the plant. In that way the performance of the mine can be assessed. Furthermore, the grade control model should be reconciled against the resource model on which the Life of Mine Plan is based. If there is a significant variation towards lower grade or lower flake size distribution, alarm bells should ring.
2) The plant output must be reconciled against the plant feed to assess recovery and coarse flake preservation - absolutely critical in assessing how well the process plant is performing.
Spin will not drive the share price, numbers will.
- Forums
- ASX - By Stock
- WKT
- Ann: Development Progress - Lindi Jumbo Mine
Ann: Development Progress - Lindi Jumbo Mine, page-6052
-
-
- There are more pages in this discussion • 1,872 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.9¢ |
Change
-0.001(1.00%) |
Mkt cap ! $66.45M |
Open | High | Low | Value | Volume |
10.0¢ | 10.0¢ | 9.9¢ | $39.97K | 400.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 130000 | 9.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 233006 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 130000 | 0.099 |
1 | 50000 | 0.098 |
4 | 201450 | 0.097 |
6 | 478512 | 0.096 |
8 | 784895 | 0.095 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 233006 | 6 |
0.110 | 1191213 | 6 |
0.115 | 338198 | 4 |
0.120 | 477177 | 4 |
0.125 | 139085 | 2 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |